City Hall will be closed Tuesday, December 31st and Wednesday, January 1st. If you need to make a utility payment, please use the drop box located on the east side of City Hall. If you have a water/sewer emergency, please call the Water Treatment Plant at 217-347-5056. We wish you a Happy New Year and hopes for a peaceful 2025!

Building and construction permit fees

Building permit fees

Type Fee
New 1- and 2- family homes
  • $10 per 100 square foot
  • $100 minimum permit fee
  • $50 for attached garage
Multi-family homes
  • $10 per 100 square foot
  • $100 minimum permit fee
  • $50 per attached garage
New commercial buildings
  • $20 per 100 square foot (up to 20,000 square foot)
  • $15 per 100 square foot (over 20,000 square foot)
  • $100 minimum permit fee
Addition, remodel (commercial or residential)
  • $10 per $1,000 of estimated cost of construction (not including electrical, plumbing or mechanical)
  • $50 minimum permit fee for residential
  • $100 minimum permit fee for commercial
Residential accessory building $50
Demolition
  • $100 (commercial or residential and accessory buildings with plumbing)
  • $25 (accessory buildings without plumbing)
Pools $50
Wireless communication facilities Refer to Appendix D of Appendix B of the Municipal Code of Effingham, as amended from time to time
Foundation only permit $50*

*If a foundation only permit is issued prior to final approval of building plans, the Permittee shall be allowed to progress with foundation only work at their own risk. In the event the City Building Official, Chief Electrical Inspector, Plumbing Inspector, and/or Fire Enforcement Official determine that a condition or plan exists within the proposed building that violates any code, rules, and/or regulations applicable within the City, the Permittee agrees that they are responsible to correct any and all such violations at their own costs.

Building permit extensions

  • First 90 day extension for permit application - no cost
  • Second 90 day extension for permit application one-half cost of original cost of the permit
    sought to be acquired
  • Permit duration extension- up to an additional 6 month period - $100

Electric and plumbing permit fees

Type Fee
New service (800 amp or less)
  • $50
  • Each additional service at same address $25
New service (over 800 amp)
  • $100
  • Each additional service at same address $25
Upgrade existing service $25
Additional circuit(s) $15
Base electric permit $15
Plumbing $5 per fixture

Sewer tap permit fees

Residential and multi-family connection fees: $500

Commercial and industrial connection fees:

Water meter size (inches) Fee
5/8 $500
3/4 $1,000
1 $1,500
1-1/2 $2,500
2 $3,750
3 $7,000
4 $12,000

Sign permit fee

The fee for signs, billboards, satellite dish antennas and other display structures (except for portable signs) for which permits are required under the provisions of the International Building Code, as adopted and amended by the City of Effingham, Illinois, within Article II of Chapter Seven of the Municipal Code of Effingham, as amended from time to time, shall be $1.00 per one square foot of display area, and $0.50 per one square foot of display area for portable signs, provided, however that the minimum fee shall be $25.00.

Utility permit fees

Type Fee
Utility permit $1,500
Blanket utility permit $1,500

Public right of way permit fees

Type Fee
Single-family residential $75
Commercial or industrial $125
Close window